| Followed plans and build fuselage bulkheads, sides and floor. Assembled the fuselage and fabricated and installed the seatbelt attach points. Noted on drawings and incorporated all changes per Rutan’s News Letters.
Completed fuselage in 1983, Shown in basement of our home in Clearwater, Kansas. |
|
![]() Landing Brake & Pitch Trim Handles |
![]() Pilots Right Arm Rest & Controls |
![]() Speed Brake Assembly Installe |
![]() Canard Attach Pins |
![]() Right Side Canard Attach Bolt |
![]() Left Side Canard Attach Bolt |
![]() Firewall Installation |
![]() FireWall Installation Backview |
![]() Firewall Installation |
![]() Left Rudder peddle installed |
![]() Right Rudder Peddle. (Note the modified Toe brake installation) |












