Fuselage

Followed plans and build fuselage bulkheads, sides and floor. Assembled the fuselage and fabricated and installed the seatbelt attach points. Noted on drawings and incorporated all changes per Rutan’s News Letters.

Completed fuselage in 1983, Shown in basement of our home in Clearwater, Kansas.

Long EZ, Fuselage

Landing Brake & Pitch Trim Handles

Landing Brake & Pitch Trim Handles

Pilots Right Arm Rest & Controls

Pilots Right Arm Rest & Controls

Speed Brake Assembly Installed

Speed Brake Assembly Installe

Canard Attach Pins

Canard Attach Pins

Right Side Canard Attach Bolt

Right Side Canard Attach Bolt

Left Side Canard Attach Bolt

Left Side Canard Attach Bolt

Firewall Installation

Firewall Installation

FireWall Installation Backview

FireWall Installation Backview

Firewall Installation

Firewall Installation

Left Rudder peddle installed

Left Rudder peddle installed

Right Rudder Peddle. (Note the modified Toe brake installation)

Right Rudder Peddle. (Note the modified Toe brake installation)

Starting the filling and sanding 6-25-06