Completed Landing gear, fabricated mounting extrusions, mounted axles, and installed landing gear on the fuselage per chapter 9. Noted on drawings and incorporated all changes in Rutan’s News Letters.
![]() Landing Gear completed in 1983 |
![]() Bow Legs are beautiful! |
![]() |
![]() |
![]() |
![]() |
![]() Installed heavy duty Matco brakes |
![]() |
NOSE GEAR INSTALL
Built up the nose gear box and mounted nose gear assembly. Built up the standard length nose per the plans and installed the pitot tube. Purchased the NG1-L nose strut and installed all attachments including the nose wheel. I original installed the Brock nose gear lift system with the manual crank. However, I recently changed and installed the Wright Nose Gear System. This was a very easy change over and well worth the cost of the system. With the O-320 engine, I needed the weight in the nose anyway.
![]() Wright Nose Gear Lift System |
![]() Wright Nose Lift Motor |
![]() Wright Nose Gear Lift System |
![]() Nose lift PC board mounted |
![]() Wright Nose Gear Foot |
![]() Nose Gear Cover |
![]() |
![]() Used Waiter's mouse trap spring! |
















